AEC Cloud Hosting | BIM & CAD Workflows | IT Vortex
AEC cloud hosting for BIM and CAD workloads by IT Vortex
AEC

Cloud Built for BIM, CAD, and Project Reality.

Cloud hosting for architecture, engineering, and construction firms whose work runs on massive BIM and CAD files, distributed teams, and project timelines that cannot wait for a slow render. Dedicated infrastructure, multi-site sync, burst capacity when the deadline demands it.

BIMCAD
Optimized
Multi
Site Sync
0%
Uptime SLA
0/7
Live Engineering
The Real Problem

What's Actually Broken in AEC IT.

Architecture, engineering, and construction firms have an IT footprint that does not match either traditional professional services or traditional creative agencies. The workloads are big, the teams are distributed, and the project economics are tight.

BIM and CAD Files Crush Generic Infrastructure

Revit central files, Civil 3D models, AutoCAD project archives, and Navisworks federated models routinely exceed 1GB per file. Generic file servers and consumer cloud storage cannot handle the access patterns, file locking, or version management.

Distributed Teams, Concentrated Project Files

Project teams span main offices, satellite offices, and job-site trailers. Everyone needs access to the same project files at the same time. Latency and bandwidth bottlenecks turn into productivity losses measured in billable hours.

Project-Based Billing Means Project-Based Cost Pressure

AEC firms bill against project fees that were quoted months or years before the work happens. IT overhead that scales unpredictably with workload creates a margin compression problem the firm cannot pass through.

Render Workloads Are Bursty

Rendering, energy modeling, structural analysis, and clash detection workloads need huge compute for short windows. Right-sizing for the peak means paying for idle capacity. Right-sizing for the average means missing deadlines.

Architecture and engineering professional working on a cloud-hosted 3D BIM model
How We Address It

Infrastructure That Understands BIM and Project Reality.

High-Throughput Storage for Large Files

All-flash storage with the IOPS profile that BIM and CAD workloads actually need. Revit central files open faster, Civil 3D models save without freezing, and Navisworks coordinations actually run.

Multi-Site Project Access

Project files hosted centrally with optimized access from satellite offices and job sites. Latency-aware caching, WAN acceleration where it helps, and file-locking semantics that AEC applications actually rely on.

Burst Compute for Renders and Analysis

Dedicated baseline capacity for daily work, with on-demand burst options for rendering, energy modeling, and structural analysis. Pay for the baseline, scale up for the deadline, scale down when the project ships.

Project Archive Lifecycle Management

Completed projects archived to lower-cost storage tiers with documented retention. Litigation hold support when needed. Regulatory archive support for projects subject to record retention requirements.

Predictable Cost for Project-Based Businesses

Per-vCPU, per-GB, no surprise bills. The firm can model IT cost into project pricing accurately, plan headcount around predictable infrastructure spend, and stop arguing with the cloud invoice every month.

Proof in This Vertical

Built and Trusted by Organizations Like Yours.

Common Questions

What AEC IT Leaders Ask Before They Sign.

Can you host Revit, AutoCAD, Civil 3D, and the rest of the Autodesk stack?
+

Yes. Autodesk applications run on Windows virtual desktops on our infrastructure. Project files live on high-throughput storage with the IOPS profile BIM workloads need. We have the operational experience with central file performance, file locking, worksharing, and the integration with Navisworks for federated coordination.

How do you handle large file collaboration across offices?
+

Project files live in a central location with optimized access from satellite offices. For firms with high-latency connections or job-site access needs, we deploy WAN acceleration or local caching tiers. The goal is to make multi-office collaboration feel local without creating version-conflict problems.

Can you handle burst rendering and energy modeling workloads?
+

Yes. Baseline workloads run on dedicated infrastructure with predictable cost. Burst workloads (rendering, energy modeling, structural analysis, clash detection) scale onto additional capacity on-demand. Pay for the baseline year-round; scale up for the deadline; scale down when the project ships.

How do you handle project archive retention?
+

Active projects on primary storage with full performance. Completed projects move to lower-cost archive storage with documented retention policy. We support legal hold for projects subject to litigation, and we support the long-retention requirements that some public-sector and infrastructure projects carry.

Do you support BIM 360, Procore, and project management platforms?
+

Most modern AEC project management platforms are SaaS offerings hosted by their vendors. We focus on the infrastructure your firm operates: BIM authoring environments, project file repositories, practice management systems, and the integrations between them and the SaaS platforms. We coordinate with the SaaS vendors where integration matters.

Get Started

Tell Us About Your AEC Environment.

We will come back with a tailored cloud assessment and proposed architecture within one business day.

AEC Cloud Consultation Request

One business day response. No obligation.